From demand letter to deployment: a realistic timeline
Four to six weeks is a planning window, not a countdown. The date moves when a medical expires, a name mismatches or a permit takes longer than the batch plan assumed.
A demand letter does not have a single delivery date. It has a chain of dates, and each one belongs to a different person. The brief belongs to the client. The medical belongs to the clinic. The entry document belongs to the destination authority. The ticket belongs to the airline. A timeline that treats all four as one number is a timeline that will be wrong.
This guide shows how we plan a Kenyan batch, what usually moves the date, and what a partner should and should not promise its own client.
Why one day count misleads
A single figure, such as a fixed day count, sounds precise. It hides the fact that the clock starts at different times for different steps. Sourcing cannot start before the role profile is agreed. The medical cannot be booked before the passport data is confirmed. The entry document cannot be filed before the contract is approved. A countdown that ignores those dependencies is a sales line, not a plan.
We use a window instead. For a complete brief, the planning window is 4 to 6 weeks from brief to travel. Inside that window, each step has its own start and finish. The window is not a promise. It is the shape of the work.
The six windows
Week 1: the brief and the document list
The desk reads the demand letter against the destination's list, confirms the roles and the quantity, and names the missing fields. The document list is issued before sourcing starts. If the brief is incomplete, this week is where it should be fixed, not in week four.
Weeks 1 to 2: sourcing and first screening
Candidates are sourced against the role profile and screened on experience, references, English and availability. The shortlist is built with a screening note for each name. A candidate who cannot travel in the window is removed here, not after the medical.
Weeks 2 to 3: vetting and medical
The passport name is checked against the request, the DCI certificate is checked at its date of issue, references are called, and the GAMCA or Wafid medical is booked. This is the stage where a missing document becomes visible. It is also the stage where a name mismatch is cheapest to fix.
Weeks 3 to 4: trade test and training
Where the role has a NITA test, the test is scheduled. Pre-departure training runs in parallel for the candidates whose documents are clear. A candidate with an open medical can attend the sessions, but the file is not presented as complete.
Weeks 4 to 6: contract, attestation and entry
The contract and the destination documents are checked against each other. The attestation chain is confirmed with the approved channel. The entry document is filed by the channel that holds the destination-side licence. The ticket is not issued until the medical and the entry document are aligned.
Travel week: handover
The handover pack carries the itinerary, the contract copy, the training record and the desk contact. The receiving channel gets the same pack. The status sheet is closed for the batch, with any post-arrival item named.
What moves the date
- A medical close to expiry. A recheck can add days and a new appointment.
- A name mismatch. A corrected passport or a corrected request can take longer than the medical.
- An attestation in the wrong order. A stamp that has to be repeated can move a candidate by a week.
- A contract change after selection. A new role or a new wage route is a new approval, not a note.
- A destination holiday or queue. The authority's calendar is not the agency's calendar.
- A missing reference. A number that does not answer can hold a single file without holding the batch.
How to read a status sheet
A useful status sheet has one row per candidate and one column per document. Each cell says complete, open or expiring, with a date and an owner. The sheet should let a partner answer three questions without calling the desk:
- Which candidates can travel in the window?
- Which document is holding each of the others?
- Who owns the next action?
If the sheet cannot answer those questions, it is a report, not a working document.
What not to promise your client
Do not promise a visa date. Do not promise that a medical result will remain valid for an unconfirmed travel date. Do not promise that a replacement will arrive in the same week if a placement does not hold. Do not promise that every candidate in the shortlist will pass every check.
Do promise the things the desk controls: a document list before sourcing, a status per candidate, a named contact and a written note when a gap appears. Those are the parts of the timeline that can be kept.
A worked example
A Saudi household brief for two housekeepers arrives on a Monday with a Musaned reference and a start date six weeks out. Week one is used to confirm the contract terms and the document list. By the end of week two, four candidates are screened and two are selected. The medical is booked in week three, and one candidate needs a recheck. The training runs for both, but only one file is complete by week four. The entry document for the complete file is filed, and the ticket is issued when the medical and the document align. The second candidate travels in the following window, not on the first ticket.
That is a normal batch. It is not a failure. The failure is telling the client that both will travel on the same day before the medical results are in.
Our demand letter fulfilment page describes the batch sequence. The visa, attestation and travel page explains which steps belong to the destination. For the Saudi route, read the Saudi Arabia market page.
Keep reading
Have an open demand letter?
Send the roles, the quantity and the destination. The desk replies with the document list for your market.